Distributed Generation Forms

To sign up for Distributed Generation at WCEC, two forms are required: the DG Interconnect Agreement (downloadable PDF signed by the member) and the Member Application for Interconnection. The process cannot begin until both documents are received. All requirements for a grid-tied system can be found in WCEC’s Distributed Generation Manual. In the process, if you have any questions, you can review the Member Policies and Schedules or contact us at: email WCEC.

DG Interconnect Agreement (Form 1)

DG-Interconnect-Agreement (PDF)

Member Application for Interconnection (Form 2)

This application will be used by WCEC to determine the required equipment configuration for facility interface. Please supply as much information as possible to avoid delays. Once complete, return by emailing Solar WCEC for processing. See Distributed Generation Interconnection and Purchase for reference. Permission to operate is granted upon the full execution of the document entitled “Agreement for Interconnection and Parallel Operation”.

Step 1 of 12

Part I - Owner/Applicant & Contractor Information

Account Name(Required)
Service Address(Required)
Contact Name(Required)
Mailing Address(Required)